Two Bathrooms and a Baby | San Francisco, CA

With a baby on the way, I had 6 weeks to design two bathrooms and complete the renovation before the baby arrived. Typically a bathroom remodel takes 8-10 weeks so this was going to be tight completing two within this short timeline. I love a good challenge, so I was excited to welcome this project to my plate. The original 1950 style bathroom was in need of a major facelift and the second bathroom didn’t even exist. After careful planning, I was able to design two full bathrooms by using closet space in the original bathroom and the second bedroom, which is now the nursery. Clients wanted modern, simple, clean and functional. We did it all and before the baby arrived. It’s amazing what you can do when you have a great team.